PPAP: The 18 Elements and 5 Submission Levels
PPAP (Production Part Approval Process) is the standard way automotive suppliers prove that a part made on their production process meets every customer requirement, and can keep meeting it at the quoted rate. A PPAP package has up to 18 elements, and the customer picks one of 5 submission levels that decides how much of that package you send versus keep on file.
This guide covers what each element is for, how the levels work, when you need a new PPAP, and a worked example of a change that triggers a resubmission. It ends with a prep checklist you can use on your next package.
What is PPAP?
PPAP is one of the automotive quality core tools published by the Automotive Industry Action Group (AIAG), alongside APQP, control plans, FMEA, MSA and SPC. AIAG describes the core tools as the building blocks of an effective quality management system. The PPAP manual itself was written by Chrysler, Ford and General Motors, and the current version is the fourth edition, dated March 2006 in GM's customer-specific requirements.
The manual is the baseline, but your customer has the final word. Automotive OEMs publish customer-specific requirements (CSRs) that add to it, and many Tier 1s have their own supplier PPAP manuals. Ford's PPAP requirements, effective February 2025, are written "for use with AIAG PPAP Fourth Edition" and add Ford's own phased approach on top. So before you build a package, read the manual and then read your customer's CSRs.
PPAP vs. APQP
APQP (Advanced Product Quality Planning) is the planning framework that runs from concept through launch. PPAP is the evidence at the end of it: the package that shows the planning worked and the production process is ready. If your APQP work was thin, the gaps show up in the PPAP, usually as a PFMEA, control plan and process flow that don't match each other.
The 18 PPAP elements
Not every element applies to every part. A supplier that doesn't own the design won't have a design FMEA, and a part with no appearance requirements won't need an appearance approval report. But you should be able to explain why each one does or doesn't apply.
| # | Element | What it shows the customer |
|---|---|---|
| 1 | Design records | The drawing, CAD model or specification the part was built to, including any material and performance specs it references. |
| 2 | Authorized engineering change documents | Approved changes that aren't on the design record yet. |
| 3 | Customer engineering approval | Evidence the customer's engineering team approved the design or test results, where they require it. |
| 4 | Design FMEA | The design risk analysis, if you're responsible for the design. |
| 5 | Process flow diagram | Every step from receiving to shipping, including rework and inspection points. |
| 6 | Process FMEA | The manufacturing risk analysis, built from the process flow. |
| 7 | Control plan | How each characteristic is controlled and checked in production. |
| 8 | Measurement system analysis (MSA) studies | Proof your gauges and methods can measure what the control plan says they measure. |
| 9 | Dimensional results | Measurements of sample parts against every dimension on the design record. |
| 10 | Records of material and performance tests | Test results showing the part meets its material and functional specs. |
| 11 | Initial process studies | Capability data for special characteristics. |
| 12 | Qualified laboratory documentation | The scope and qualification of the labs that did the testing. |
| 13 | Appearance approval report | Customer sign-off on color, grain and texture, for parts with appearance requirements. |
| 14 | Sample production parts | Parts from the production run, sent or held as the customer requires. |
| 15 | Master sample | A retained part signed off with the customer, kept for reference. |
| 16 | Checking aids | Fixtures and gauges specific to the part, with their calibration and MSA records. |
| 17 | Customer-specific requirements | Records of compliance with anything extra your customer asks for (Ford, GM and others publish theirs). |
| 18 | Part Submission Warrant (PSW) | The summary form, signed by the supplier, that confirms the parts meet the customer's requirements. |
The elements build on each other. The process flow feeds the PFMEA, the PFMEA feeds the control plan, and the control plan names the gauges that need MSA. That chain is why reviewers often start with those three documents: if they disagree, the rest of the package is suspect. Our guide to managing risk with PFMEA covers that step in more depth.
The 5 PPAP submission levels
The submission level decides what you send to the customer. It doesn't change what you have to do: at every level, you're expected to complete all applicable elements and keep them on file. Here are the levels as customers' supplier guidelines reproduce them, for example TI Automotive's supplier PPAP guideline.
| Level | What the supplier submits |
|---|---|
| Level 1 | Part Submission Warrant only |
| Level 2 | PSW with product samples and limited supporting data |
| Level 3 | PSW with product samples and complete supporting data |
| Level 4 | PSW and other requirements defined by the customer |
| Level 5 | PSW with product samples and complete supporting data, reviewed at the supplier's manufacturing location |
Level 3 is often the default. TI Automotive's guideline, for example, states that the default is Level 3 and that any exception needs written authorization before submission. Some customers use only some of the levels: Ford's requirements refer to "all PPAP submission levels (1, 3 and 5)".
Submitted vs. retained
The AIAG manual includes a table that marks each element, at each level, as submitted to the customer, retained at your site and made available on request, or retained and submitted only if the customer asks. Customers often reproduce their own version of it. Two points trip suppliers up:
- Retained doesn't mean optional. A Level 1 submission is only a PSW, but the customer can ask for the PFMEA, control plan or MSA at any time, and they need to exist and be current.
- The PSW is submitted at every level. It's the one element that always goes to the customer.
The Part Submission Warrant
The PSW is the form that ties the package together. It identifies the part and the submission, records the part's weight, and is signed by an authorized person at the supplier to confirm the parts meet the customer's requirements.
The details vary by customer. TI Automotive, for example, requires a separate PSW for each part number unless agreed otherwise, rejects the whole PPAP if any PSW field is left blank, and asks for part weight in kilograms to four decimal places, averaged over 10 randomly selected parts. Ford uses its own phased PPAP PSW. Check your customer's format before you fill it in.
When do you need a new PPAP?
A new part always needs one. The harder question is which changes to an approved part need a resubmission. Your customer's CSRs answer that. Ford's requirements, for example, say PPAP submission is required for, but not limited to:
- All new tooled parts
- A design change to an existing part
- Any change in supplier operating pattern
- Any change in the manufacturing process after PPAP approval
- Any additional or modified production tooling or equipment
- Revised Ford required capacity that exceeds verified supplier capacity
The safe habit is to treat any change to a PPAP-approved process as something to raise with your customer before you make it. GM's requirements, for example, say all design changes, including those proposed by suppliers, need written approval or a waiver from the authorized customer representative before production implementation. That's also why change control matters so much in automotive: the hard part isn't the paperwork, it's noticing that a change happened. A layered process audit program is one way to catch process drift before a customer does.
Interim approval
If a package isn't fully ready but the customer needs parts, some customers grant interim approval with limits. TI Automotive's guideline, for example, says interim approvals are given only under special circumstances and are valid for defined timescales, batches or quantities. Treat an interim approval as a deadline, not a finish line: the open items still need to close.
A worked example: adding a second press
Here's a simple scenario. A Tier 2 supplier stamps a steel bracket for a Tier 1 customer. The bracket was approved at Level 3 last year. Demand goes up, so the supplier builds a duplicate die and runs it on a second press.
- Is a new PPAP needed? Very likely. Additional production tooling and a change to the manufacturing process are both on lists like Ford's. The supplier checks the Tier 1's CSRs and contacts its customer quality engineer before running production parts.
- What changes in the package? The process flow gets the second press. The PFMEA adds any failure modes specific to the new die or press. The control plan adds the checks for the second stream.
- What new evidence is needed? Dimensional results and initial process studies on parts from the new die, and MSA on any new or different gauges. Material test results may still be valid if the steel source hasn't changed, but the customer decides.
- Submission. A new PSW at the level the customer asks for, with the reason for submission stated.
The supplier that handles this well is the one that knew about the change before the die was built. The one that handles it badly finds out when the customer's receiving inspection flags a dimensional shift.
PPAP prep checklist
Use this as a running order for building a package. It's a starting point, so add your customer's specific items.
| Stage | What to check |
|---|---|
| Before you start | Read the customer's CSRs and purchase order. Confirm the submission level, the PSW format, the number of sample parts and any extra items (packaging, IMDS, run-at-rate). |
| Design inputs | Collect the current design record and every authorized change. Check the revision level on the drawing matches the one on the purchase order. |
| Risk and control | Build the process flow, then the PFMEA from it, then the control plan from the PFMEA. Make sure the step numbers and characteristics match across all three. |
| Measurement | Finish MSA on the gauges named in the control plan before you collect dimensional or capability data. |
| Sample run | Take samples from a production run with production tooling, people, materials and rate. Measure every dimension and run the required tests. |
| Capability | Run initial process studies on special characteristics and check the results against the customer's acceptance criteria. |
| Sign-off | Complete every field of the PSW, record the part weight in the format the customer asks for, and have an authorized person sign it. |
| After approval | Keep the full package, including retained elements, for as long as the customer requires, and keep the process exactly as approved. |
Common reasons PPAPs get rejected
- Documents that don't agree. Process steps in the flow diagram that don't appear in the PFMEA or control plan, or characteristics numbered differently across them.
- Wrong revision level. Dimensional results taken against an older drawing than the one on the PSW.
- Incomplete PSW. Blank fields, missing part weight or no authorized signature.
- Samples not from a production run. Parts made with prototype tooling, a different operator setup or a slower rate than production.
- MSA done after the data. Dimensional and capability results collected with gauges that hadn't been studied yet.
- Missing CSR items. Packaging approvals, material reporting or anything else the customer lists but the manual doesn't.
When a rejection traces back to a sub-supplier's material or component, a supplier corrective action request gets it fixed at the source instead of patched in your package.
Keeping PPAP records
Retention periods come from your customer. A common rule is the time the part is active for production and service, plus one calendar year: GM's requirements use that wording unless the customer specifies otherwise, and TI Automotive's guideline is similar. Some customers set longer periods for specific elements, so check your CSRs.
The bigger risk isn't throwing records away too early. It's letting retained elements go stale. If you changed the control plan after approval and the copy in the PPAP file is the old one, you have a gap the next time the customer asks for it. If you supply into automotive and are working toward a full automotive QMS, our guide to MAQMSR for sub-tier suppliers explains where the product approval process fits.
How Isolocity supports the work behind a PPAP
The records behind a PPAP need to stay controlled and current long after approval. Isolocity's automotive QMS supports IATF 16949:2016 compliance, and several of its modules cover that work:
- Document control. Document Management covers revision control, 4-stage approvals, change control and an audit trail, so the control plan in your PPAP file is the approved one.
- Risk and nonconformance. The CAPA module includes PFMEA, risk management, non-conformances, deviations and supplier quality management.
- Inspection and calibration. The Inspection module covers receiving and product inspection, specification management, calibration and SPC.
- Suppliers. Suppliers can upload certifications and documents through a supplier portal, and the platform tracks supplier performance metrics such as on-time delivery.
PPAP FAQ
What does PPAP stand for?
Production Part Approval Process. It's the AIAG process automotive suppliers use to get customer approval for a production part.
What is PPAP in manufacturing?
It's the evidence package a supplier submits to show that parts made on the real production process, with production tooling and at the production rate, meet every customer requirement.
What is the default PPAP level?
Level 3 is often the default, but your customer sets the level. Check the purchase order and the customer's CSRs.
Is PPAP only for automotive?
It started in automotive and that's where it's most common, but suppliers in other industries sometimes use PPAP or a similar part approval process when a customer asks for it.
What's the difference between PPAP and first article inspection?
First article inspection checks that a first part matches its design. PPAP covers more: process risk, control plans, measurement systems and capability, as well as dimensional results.
Conclusion
A clean PPAP is mostly the result of work done earlier: a process flow, PFMEA and control plan that agree, measurement systems you've proven, and change control that catches changes before your customer does. The package is just where that work becomes visible. If you want to see how Isolocity keeps those records controlled, book a demo.