First Article Inspection (AS9102): A Practical Guide

AS9102 first article inspection explained: the 3 forms, when a change needs a full or partial FAI, a delta FAI example and a pre-submission checklist.
Aerospace & Automotive
Audits & Inspections
Blog
November 23, 2026

AS9102 is the aerospace standard that sets out how to perform and document a first article inspection (FAI): an objective check that your production process can make a part that meets every requirement on the drawing and purchase order. The current revision is AS9102C, published by SAE in 2023, and aerospace customers such as Boeing flow it down to their suppliers through the purchase order.

This guide covers what AS9102 asks for, what goes on Forms 1, 2 and 3, and the part most teams get wrong: deciding when a change means a full FAI, a partial (delta) FAI, or no new FAI at all. It includes a decision table and a worked partial FAI example you can adapt.

What is first article inspection?

A first article inspection is a production validation step. You take a part made with the production process, tooling and materials you intend to use, and you verify and record that every design characteristic conforms. The SAE description of AS9102C says the standard "establishes the requirements for performing and documenting FAI" and stresses that those requirements are complementary to, not a replacement for, customer and regulatory requirements.

That last point matters in practice. AS9102 gives you the method and the forms, but your customer's purchase order and supplier quality manual decide when FAI is invoked, how it is submitted and what extra fields they expect. Boeing, for example, states that it has adopted AS9102 as its supplier requirement for applicable purchased hardware FAI, "as flowed by the purchase document."

FAI is different from routine part and product inspection. Routine inspection checks that each lot conforms. FAI checks that the process itself is capable of producing a conforming part before you rely on it, and it produces a record (the FAI report, or FAIR) that your customer can review.

Who needs AS9102?

AS9102 applies to organizations that make or assemble aerospace hardware when a customer contract invokes it. That usually means machine shops, fabricators, special process houses and assemblers in the supply chains of aircraft, engine and defense manufacturers. ASQ's summary of the Rev C update describes the revision as improving alignment with the production process verification section of AS9100, so if you hold or are working toward AS9100 certification, your auditor will expect to see how FAI fits into your production process controls.

Two scope notes to keep straight:

  • Software is out of scope. Boeing's supplier FAI guidance notes that AS9102 does not apply to software and points to AS9115 for software.
  • Old records are not automatically void. Boeing states that FAI records created before AS9102 was flowed down do not have to be updated to the standard, but any new partial or repeat FAI must comply.

The three AS9102 forms

AS9102 records an FAI on three forms. Many customers publish their own field-by-field instructions for them, so check your customer's version before you start.

FormNameWhat it captures
Form 1Part Number AccountabilityIdentifies the part being inspected (part number, revision, serial or lot), the organization, whether the FAI is full or partial, the reason, and any lower-level assemblies or detail parts with their own FAIs.
Form 2Product Accountability: Materials, Special Processes and Functional TestingLists materials, special processes (heat treat, plating, NDT and so on) and functional tests called up by the design, with the supplier, specification and certificate of conformance for each.
Form 3Characteristic Accountability, Verification and Compatibility EvaluationLists every design characteristic, usually numbered to a ballooned drawing, with the requirement, the actual measured result, the tool used and any nonconformance reference.

Form 3 is where most of the effort goes. Every dimension, tolerance, note and specification call-out on the drawing becomes a numbered characteristic, and each one needs an actual result rather than "OK" or a check mark.

Full FAI vs partial (delta) FAI: when to repeat it

Once a customer invokes FAI, the requirement does not end after the first part. Lockheed Martin's MFC supplier FAI guidebook puts it plainly: "The FAI requirement, once invoked, will continue to apply even after initial compliance." The question every quality team faces is how much of the FAI to redo after a change.

The triggers below are drawn from AS9102 section 4.6 as customers restate it in their supplier requirements. The MFC guidebook lists a change in design; a change in manufacturing source, process, inspection method, location, tooling or material; a change to numerical control programs; a natural or man-made event that may affect the process; and a corrective action needed to complete a previous FAI. Textron Systems' supplier FAI instruction adds a lapse in production of two years. Other customers set the lapse period in the purchase order, so always check yours.

What changedUsual FAI scopeWhat to re-verify
New part number, or first production run for a new customerFull FAIAll characteristics on Forms 1, 2 and 3
Drawing revision that changes some characteristicsPartial FAIOnly the characteristics added or changed by the revision, plus any characteristic the change could affect
New manufacturing location or new source for the partFull or partial FAI, depending on the customer's termsOften all characteristics, because the whole process has moved
New or modified tooling, fixture or NC programPartial FAICharacteristics produced or held by that tool, fixture or program
Change of material or special process supplierPartial FAIForm 2 entries for that material or process, plus characteristics the process affects (for example, post-plating dimensions)
Change in inspection methodPartial FAICharacteristics measured with the new method
Corrective action needed to close a previous FAIPartial FAIThe characteristics that were nonconforming, plus anything the fix could affect
Lapse in production beyond the customer's limit (two years in some flowdowns)Usually full FAI; check the customer's termsAll characteristics
Event that may have affected the process (fire, flood, major machine crash)Partial or full, depending on what was affectedCharacteristics made on the affected equipment or area

When the scope is a judgment call, write down the reasoning. An auditor or customer source inspector will ask why you re-verified 12 characteristics and not 40, and "we thought it was fine" is not an answer. A short rationale on Form 1, backed by the change record, is.

Worked example: a partial FAI after a drawing change

Here is a hypothetical example of how a partial FAI comes together. A machine shop makes a mounting bracket. The full FAI was completed at revision B. The customer releases revision C, which tightens the tolerance on one bore and adds a chamfer. Nothing else on the drawing changes, and the shop keeps the same machine, program family and material.

  1. Confirm the scope. Compare revision B and revision C side by side. Two characteristics are affected: the bore (tolerance changed) and the new chamfer (added). The shop also flags the bore's true position, because the new tolerance may require a program change that could shift it.
  2. Update the planning. Re-balloon the revision C drawing so characteristic numbers stay traceable to the original FAI. Update the inspection plan for the bore and chamfer.
  3. Fill in Form 1. Mark the FAI as partial. In the baseline field, reference the previous FAI part number and revision (the MFC guidebook asks for "the previous FAI part number or approved configuration (including revision level)"). State the reason: "Drawing revision B to C: bore tolerance change and added chamfer."
  4. Skip or carry Form 2. Materials and special processes did not change, so there are no new Form 2 entries. Note that in the rationale.
  5. Complete Form 3 for the affected characteristics only. Record the bore diameter, the chamfer and the bore's true position with actual measured values and the gauges used.
  6. Handle any nonconformance before sign-off. If the bore measures out of tolerance, raise a nonconformance report, correct the process, and re-verify. A corrective action needed to complete an FAI is itself a partial FAI trigger.
  7. Submit and file. Submit through the channel the customer specifies, and keep the partial FAI with the original full FAI so the complete history of the part is in one place.

FAI checklist before you submit

Use this as a final check on any full or partial FAI package. Adjust it to match your customer's instructions.

  • The part was made with production tooling, materials, process and location, not a prototype setup.
  • The drawing and purchase order revisions on Form 1 match what the customer released.
  • Every characteristic on the drawing is numbered and appears on Form 3, including notes and specification call-outs.
  • Each Form 3 line has an actual result, not a check mark, and names the inspection tool.
  • Inspection equipment used was in calibration on the day of inspection.
  • Every Form 2 entry has a matching certificate of conformance or test report from an approved source.
  • Lower-level part and assembly FAIs are referenced on Form 1.
  • Any nonconformance found during the FAI has a nonconformance record and a disposition.
  • For a partial FAI, the baseline part number and revision and the reason are filled in, and the scope rationale is attached.
  • The package is signed by the people your procedure and the customer require.

Where FAI breaks down, and how a QMS helps

Most FAI problems are not measurement problems. They are record problems: the drawing revision on Form 1 does not match the latest release, a material cert is missing, a nonconformance was found but never formally dispositioned, or nobody can find the original FAI when a partial one is needed.

Those are the gaps an electronic QMS is built to close. Isolocity's Aerospace QMS supports FAI work alongside other aerospace-specific processes. Teams can auto-import inspection and testing results from their inspection software and export records as CSV or PDF for customer reporting. The inspection module provides custom inspection templates with revision control and an audit trail, and links failed inspections to nonconformance and CAPA records. With the inventory add-on, the platform tracks traceability by lot, batch or serial number.

FAQ

What is a first article inspection report?

A first article inspection report (FAIR) is the completed set of AS9102 forms, usually Forms 1, 2 and 3, plus supporting evidence such as the ballooned drawing, material certificates and special process certifications. It is the record your customer reviews to accept the FAI.

What is a delta first article inspection?

A delta FAI is another name for a partial FAI. It re-verifies only the characteristics affected by a change, such as a drawing revision or a tooling change, and references the earlier full FAI as its baseline.

What is first article inspection in aerospace?

In aerospace, first article inspection usually means FAI performed and documented to AS9102 because a customer has invoked it in the purchase order. It confirms that the production process can make a conforming part before regular deliveries begin.

Is AS9102 the same as PPAP?

No. Both validate a production process before regular supply, but PPAP is the automotive industry's part approval process, with its own elements and submission levels. AS9102 is the aerospace standard for FAI.

Does a new drawing revision always need a new FAI?

Usually it needs at least a partial FAI covering the characteristics that changed. Whether you can skip FAI for a purely administrative revision (for example, a title block correction) depends on your customer's requirements, so confirm it in writing.

Conclusion

AS9102 is not complicated on paper. The work is in applying it consistently: scoping each partial FAI with a clear rationale, recording actual results for every characteristic, and keeping each FAI linked to the drawing revision, the material certs and any nonconformance it raised. If your team is still managing that across spreadsheets and shared drives, book a demo to see how Isolocity keeps inspection, nonconformance and document records together.

Testimonanial

Insights and Inspiration,
Explore Our Blog

Isolocity blog cover with an automotive icon and the title PPAP: The 18 Elements and 5 Submission Levels
No items found.

PPAP: The 18 Elements and 5 Submission Levels

PPAP explained: the 18 elements, the 5 submission levels, when a change needs a new PPAP, a worked example, and a prep checklist for your next package.
November 20, 2026
11 min read
Isolocity blog cover reading FDA Form 483 vs. Warning Letter
No items found.

Form 483 vs. Warning Letter: Meaning and How to Respond

What an FDA Form 483 and a warning letter mean, how one leads to the other, and how to build a 483 response in the 15 business days that count.
November 18, 2026
8 min read
Isolocity blog cover with a cannabis industry icon and the title Michigan Cannabis Compliance Guide (2026)
No items found.

Michigan Cannabis Compliance: What Licensed Operators Need to Know (2026)

What Michigan's CRA expects from licensed cannabis operators: license types, testing, labeling, Metrc, recalls, records, inspections and 2026 rule changes.
November 15, 2026
13 min read